My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-08_REPORT - C1996084
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2008-02-08_REPORT - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:27 PM
Creation date
2/13/2008 10:54:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REPORT
Doc Date
2/8/2008
Doc Name
2006 ARR Response Letter
From
Peak Project Management LLC
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2006 <br />(Revised 1-30-08) <br />Lorencito Canyon Mine C-96-084 Lorencito Coal Company LLC <br />mine name permit # Permittee <br />Address: <br />4422 Bryan Station Road, Lexington, KY 40516 <br />This report, required by Rute 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if appl'ICable) should be dearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 15 5.2 + 0 15 5.2 <br />Acres badcfilled and raded 12 2.1 + 0 12 2. 1 <br />Acres to soiled 8 9.8 + 2 8.5 -115.7" <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />....~....~,te.....,. hsl.,... r'U. not innL~rln ~nrcc that hsvo arhiwvarl final Phase III rP_IP_asP_ <br /> Last Years This Greater <br /> CumutaWe Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded; ~ 9. 8 + 3 5.9 _ 115 .7 115.7 + 0 <br />"include, if necessary, a description of any augmentea seeamg or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 15 5.2 and the total number of acres: <br />Phase I released 12 2. 1 Phase II released 0 Phase 111 released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilfies subject to reclamation but yet to be completed 1 .4 <br />For Government Performance and ResuHs Act <br />Acreage in long-term mining or reclamation facilities z 3 3.1 <br />Acreage in active mining areas ~ 0 <br />'(exclude acxes where Phase III release has been acueved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage aril construction areas; <br />office area, repair shops, and panting; kcal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; vertiilation shafts and entryways; <br />arx7 noncoal waste disposal area (garbage dumps and coal combustion by-products d'~posat areas). <br />' Includes pits, topsail stripped areas in advance of pits, art spoil not bacldlled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.