My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-02_GENERAL DOCUMENTS - C1981039
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981039
>
1997-07-02_GENERAL DOCUMENTS - C1981039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 5:33:51 PM
Creation date
2/13/2008 10:40:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/2/1997
Doc Name
Documented Quote
From
Paul Krabacher
To
Interested Contractors
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> C <br /> will.not exceed a depth of 6" . The width of the base application will not exceed 12'. <br /> Measurement and Payment <br /> Payment for this task will be reflected under Item 5 of the Bid Schedule as a 10 yds3 load <br /> price. The 10 yds3 load price shall reflect the CONTRACTORS estimate for procuring, <br /> delivery and the spreading out of the specified roadbase to complete the task. Measurement <br /> will be actual 10 yds3 loads required to complete work as directed and approved by the <br /> PROJECT MANAGER. All of the loads outlined under Item 5 are NOT guaranteed. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor construction <br /> activities and ensure that each work item is completed and constructed to design <br /> specifications. The PROJECT MANAGER will be available during regular business hours <br /> (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend days <br /> or holidays without prior approval of the PROJECT MANAGER. It is the Contractor's <br /> responsibility to schedule inspections with the Project Manager so as not to delay the work. <br /> The following items must be observed and approved by the PROJECT MANAGER before <br /> proceeding with additional work: <br /> Item 2. Trash removal - Grassy Gap <br /> 1. Disposal method prior to work <br /> Item 3. Equipment Rental <br /> 1. All hours <br /> Item 5. Road Base <br /> 1. Road base delivery prior to spreading <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.