My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-02_GENERAL DOCUMENTS - C1981039
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981039
>
1997-07-02_GENERAL DOCUMENTS - C1981039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 5:33:51 PM
Creation date
2/13/2008 10:40:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/2/1997
Doc Name
Documented Quote
From
Paul Krabacher
To
Interested Contractors
Permit Index Doc Type
Reclamation Projects
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 9 <br /> STATE OF COLOMDO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 VON <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> DATE: July 2, 1997 NATURAL <br /> RESOURCES <br /> TO: Interested Contractors Roy Romer <br /> Governor <br /> James S.Lochhead <br /> FROM: Paul Krabacher, Division of Minerals and Geology Executive Director <br /> Michael B.Long <br /> RE: Documented Quote, Grassy Gap Maintenance Project, PKA-8-1036 Division Director <br /> Enclosed is a brief description and bid schedule for the Grassy Gap Maintenance Project. <br /> PROJECT LOCATION <br /> The Grassy Gap mine site is located approximately 13 miles southeast of Hayden, Colorado. <br /> Follow State Highway 40 east of Hayden for 4.6 miles. Just past-the turnoff to the <br /> powerplant, take County Road 27 south for 7.2 miles to the turnoff at Grassy Gap which <br /> heads west from the saddle. Follow the mine road for approximately 1 mile to the mine site. <br /> WORK SUMMARY <br /> Project work will consist of trash removal, repair work on a standpipe, hauling road base for <br /> road repair work and performing minor road maintenance using a Cat D5H - or 120 <br /> minimum fhp equivalent with Power-Angle-Tilt, multiple rippers and operator <br /> PRE-BID MEETING/SITE SHOWING <br /> There will be no pre-bid meeting or site showing. Project work will be discussed after the <br /> completion of the Edna Project pre-bid meeting on July 24, 1997. <br /> BID OPENING DATE <br /> All bid openings are open to the public and bidders are welcome to attend and record the bid <br /> results. A written tabulation of the Bid results will be available to those bidders who submit <br /> a clearly-visible, self-addressed, stamped envelope with their bid. Please allow two weeks <br /> for receipt of Bid results. Telephone requests cannot be honored because of time constraints. <br /> The bid opening date for this project is August 15, 1997 at 2:30 p.m. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.