Laserfiche WebLink
MINING PLAN (coNT) EXHIBIT C <br />will be moved to another site and the processed material will be <br />removed as needed. The mine will operate from March 1 to Novem- <br />ber 15 with periods of inactivity when adverse weather conditions <br />exist or there is no demand for material. During most years this <br />is the only time the mine is accessible due deep snow. No <br />estimate can be made on how long these periods of inactivity will <br />be, but some may last up to 6 months or more. <br />The bond estimate presented on Page 11 shows the amount of <br />land that will be disturbed as a worse case scenario. The <br />benches will be reclaimed as they are created and no additional <br />sloping will be necessary. The floor of the mine will be graded <br />so is the drainage pattern matches the existing conditions. Map <br />Exhibit E-2 shows how we think the site will look when reclamation <br />is complete. <br />Little or no water will be used at the site. If dust <br />control water is used it will be obtained from sources Grand <br />County has available and approved for that use. <br />8 <br />