Laserfiche WebLink
Memo to Russ Means 9 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Quantity Extended. Cost <br />Set Rebar Anchors and Fine Site Cleaning <br />Decline Bulkheads (both) <br />1.25 yard Load Haul Dump $35/hr. x 10.5 hrs. x 2 x 1.5 $1102.50 <br />Pack Rat. <br />1.25 yard :Load Haul Dump <br />$35/hr. x 18.5 hrs. x 1.5 <br />$971.25 <br />Build Forms, Set Pipes, Valves, and Rebar, Divert Water <br />All. Whirlwind Bulkheads <br />1.25 yard Load Haul Dump $35/hr. x 85.6 hrs. x 3 x 1.5 <br />Set Up and Pour Bulkhead <br />Decline Bulkheads (both) <br />1.25 yard Load Haul Dump <br />Forklift <br />Pack Rat <br />1.25 yard Load Haul :Dump <br />Forklift <br />Strip Forms, Move Equipment, and Grout Bulkhead <br />All Whirlwind Bulkheads <br />1.25 yard Load Haul Dump <br />Miscellaneous Costs <br />All Whirlwind Bulkheads <br />Compressor usage <br />Air Bean 25 pump usage <br />Flight 123 HP pump usage <br />GD 83 jackleg <br />Outside loader <br />$35/hr. x 21 hrs, x 2 x 1.5 <br />$20/hr. x 21 hrs. x 2 x 1.5 <br />$35/hr. x 38 hrs. x 1.5 <br />$20/hr. x 38 hrs. x 1.5 <br />$35/hr. x 128.4 hrs. x 3 x 1.5 <br />$3000x3x 1.5 <br />$1200x3x1.5 <br />$1620x3x 1.5 <br />$11.25x3x 1.5 <br />$6000/mo. x 3 x 1.5 <br />Subtotal Other Equipment, not including overhead and profit <br />Overhead and Profit @ 1.3.0`x'% <br />Subtotal. <br />Add 5% DRMS administration required by statute <br />Other Equipment Component of Bulkhead Bond <br />Bond Amount for One Required and Two Contingency Bulkheads <br />Labor $170,558.00 <br />Supplies, Equipment, and Engineering $238,050.00 <br />Other Equipment $122,639.00 <br />Total $531,247.00 Direct and ltidirect Costs Inclusivrer <br />$13,482.00 <br />$2205.00 <br />$1.260.00 <br />$1,995.00 <br />$1140.00 <br />$20,223.00 <br />$13,500.00 <br />$5400.00 <br />$7290.00 <br />$5062.50 <br />$27,000.00 <br />$103,297.50 <br />13.500.98 <br />116.798.48 <br />_583).92 <br />$? 22,639.00 <br />c. `act ti=t;-MV-, "D wm m>s 4-19-06 141YVAVI ir':-MAd F,ti khezd coil6.c OC