My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-06_PERMIT FILE - M2007044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-06_PERMIT FILE - M2007044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:19 PM
Creation date
2/11/2008 8:02:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/6/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Russ Means 8 November 1.4, 2007 <br />Whirlwind Mine Bulkhead Costs File .No. M:-2007-044 <br />Task and Cost Item. Quantity Extended Cost <br />Diesel. $1500 x 3 $4500.00 <br />Electricity $5000 x 1.5 $7500.00 <br />Safety supplies $1000 x 1.5 $1500.00 <br />Intake screen, bypass pipe $200 x 1.5 $300.00 <br />Install Ventilation <br />Terry Tunnel <br />Generator $800 <br />Fan $3000 <br />Flatbed truck and loader $700 <br />Contractor install $6400 <br />Vent bag $4755 <br />Lower Decline Bulkhead <br />Generator $800 x 1.5 $1200.00 <br />Fan $3000 x 1.5 $4500.00 <br />Flatbed truck and loader $700 x 1.5 $1050.00 <br />Contractor install (note: would not mobilize for less) $6400 x 1.5 $9600.00 <br />Vent bag $4755 x 0.65 x 1.5 $4636.13 <br />Upper Decline Bulkhead <br />Generator $800 x 1.5 $1200.00 <br />Fan $3000 x 1.5 $4500.00 <br />Flatbed truck and loader $700 x 1.5 $1050.00 <br />Contractor install (note: would not mobilize for less) $6400 x 1.5 $9600.00 <br />Vent bag $4755 x 0.59 x 1.5 $4208.18 <br />Pack Rat <br />Generator $800 x 1.5 $1200.00 <br />Fan. $3000 x 1.5 $4500.00 <br />Flatbed truck and loader $700 x 1.5 $1050.00 <br />Contractor install (note: would not mobilize for less) $6400 x 1.5 $9600.00 <br />Vent bag $4755 x 0.62 x 1.5 $4422.15 <br />Subtotal Supplies, Equipment, and Engiteering, includes overhead and profit $226,714.65 <br />Add 5% DRIMS administration required by statute: _--11.335.73 <br />Supplies, Equipment, and Engineering Component of Bulkhead Bond $238,050.00 <br />Other .Eaulnnnent Costs, not including Overhead and Profit <br />Task. and Cost Item Quantity Extended Cost <br />Initial. Site Cleaning <br />Decline Bulkheads (both) <br />Two yard Load Haul Dump $45/hr. x 10.5 hrs. x 2 x 1.5 $1417.50 <br />Pack. Rat <br />Two yard Load Haul Dump $45!1ir.. x 18.5 bts, x 1 ,5 51248.75
The URL can be used to link to this page
Your browser does not support the video tag.