My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-06_PERMIT FILE - M2007044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-06_PERMIT FILE - M2007044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:19 PM
Creation date
2/11/2008 8:02:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/6/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,,t Memo to Russ Means 2 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Ventilation: <br />:Decline portal elevation 7084' lower decline bulkhead elevation 6936' decline driven at 6% grade <br />2467 linear feet from portal to lower decline bulkhead location <br />Upper decline bulkhead elevation 6950' <br />2233 linear feet from portal to upper decline bulkhead location <br />2350 linear feet (assumed) from Pack Rat portal to contingency bulkhead location <br />Terry Tunnel bulkhead 3 800 1 inearfeet (actual) inby the portal. <br />Lower decline bulkhead ventilation reduction factor: 2467/3800 = 0.65 <br />Upper decline bulkhead ventilation reduction. factor: 2233/3800 = 0.59 <br />Pack Rat bulkhead ventilation reduction factor: 2350/3800 = 0.62 <br />Note: Since a monitoring period will occur between installation of the lower and upper decline bulkheads, it <br />is assumed that ventilation will have to be completely re-installed in the decline at the time of upper <br />bulkhead construction. <br />Adjustment from 1996 cost to 2007 costs from Means (2007): <br />Index for 2007 = 166.3 <br />Index for 1996 = 110.2 <br />166.3/110.2 = 1.5 adjustment factor <br />Bulkhead Installation Labor Estimate includes Overhead and Profit <br />Task and Cost Item Quantity Extended Cost <br />initial site cleaning <br />Terry Tunnel 50 hrs. <br />Lower Decline Bulkhead 50 x 0.21 = 10.5 hrs. <br />Upper Decline Bulkhead 50 x 0.21 = 10.5 hrs. <br />Pack Rat Bulkhead 50 x 0.37 = 18.5 hrs. <br />Lower Decline Bulkhead <br />1 laborer inside @ $41.65/hr. 10.5 hrs. $437.33 <br />1 laborer outside @ $41.65/hr. 10.5 hrs. $437.33 <br />1 Equip. Op. (light) C $53.45 10.5 hrs. $561.23 <br />Upper Decline Bulkhead <br />1. laborer inside @ $41.65/:4r. 10.5 hrs. $437.33 <br />1 laborer outside (; $41.651hr. 1.0.5 lirs. $437.33 <br />1 Equip. Op. (light) @ $53.45 10.5 hrs. $561.23 <br />Pack Rat Bulkhead <br />1 laborer inside @ $41.651hr. 18.5 hrs. $770.53 <br />1 laborer outside @ $41.65ihr. 18.5 hrs. $770.53 <br />1 Equip. Op. (light) @ $53.45 18.5 hrs. $988.83 <br />Set: rebar anchors and fine site cleaning <br />Terry 'funnel 50 hrs.
The URL can be used to link to this page
Your browser does not support the video tag.