Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name :DRMS <br />Task # : 01w State : Colorado Permitrob# : M-2007-044 <br />Dale : 05-Feb-2008 County : Mesa Abbreviation :none <br />User : GRM Site : Whirlwind Mine Filename : M044-Of w <br />Permitting action :Initial Reclamation Liability Estimate <br />Task description : demo of structures at Whirlwind portal <br />UNIT COSTS Last unit cost update : May, 2007 Location adjustment : 92.32% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-water treatment sludge disposal 40 cu/yds concrete slurry 40.00 cy $200.0000 $8,000.00 <br />-chain link fencing 6' chain link fence Fencing, chain link - to 6 ft. H 1,100.00 LF $1.9200 $2,112.00 <br />-barbed wire fencing 3 strand along roads Fencing, barbed wire, - 3 strand 2,500.00 LF $1.0700 $2,675.00 <br />-water treatment liner disposal 7000 sq/ft haul /disposal 7,000.00 SF $0.7500 $5.250.00 <br />-shop building 40X50 Demo./disp./appr. dump - to 60 mi. 222.00 CF $1.1772 $261.34 <br />-shop slab 40X50X6" Demo./disp. exc, pit, 6" th.- 200 ft. 3,000.00 SF $1.7349 $5,204.74 <br />-used oil pad 8X10X4" Demo./disp. exc. pit, 4" th.- 200 k. 80.00 SF $1.1566 $92.53 <br />-aux. slab 4 X 6 X 6" Demo./disp. exc. pit, 6" th.- 200 ff. 24.00 SF $1.7349 $41.64 <br />ore pad sump 6 X 6 X 6" Demo./disp. exc. pit, 6" th.- 50 ft. 36.00 SF $1.7164 $61.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />?,ar a <br />JOB COST Subtotal (unadjusted): $23,699 1 otal t.ost (aojusteo Tor 10ca110nj: ,P.