Laserfiche WebLink
Agency or organization name : CDRMS <br />Permit or other job action :Jeep Trail Exploration <br />Task description :Replace topsoil on regraded access road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,016 LCY factor : NA volume : 2,016 LCY <br />Source of estimated volume :App. 1.05 acres X 12 in thick <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors ,;; .... ; <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.50 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Earth -Dry packed <br />,: ;:, <br />JOB TIME AND COST <br />Adjusted unit production : 582.09 LCY/hr <br />Adjusted fleet production : 582.09 LCY/hr <br />Fleet size : 1 Dozers) Total job time : 3.46 Hours <br />Unit cost : $0.357 /LCY Total job cost : $719 <br />