My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-02_PERMIT FILE - X200821712
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200821712
>
2008-02-02_PERMIT FILE - X200821712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:02 PM
Creation date
2/6/2008 9:26:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200821712
IBM Index Class Name
PERMIT FILE
Doc Date
2/2/2008
Doc Name
Completeness/Adequacy Letter
From
DRMS
To
J.E. Stover & Associates, Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />BULLDOZER WORK <br />:.... ::. <br />PROJECT IDENTIFICATION <br />Task # : X06 State :Colorado PermiUjob# :X--2008-217-12 <br />Date : 01/23/2008 <br />User : JDM <br />Agency or organization name : CDRMS <br />Permit or other job action :Jeep Trail Exploration <br />Task description : Regrade access road <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9U (2005) Horsepower : 405 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $71.87 NA <br />Operating cost/hour : $103.73 100 <br />Ripper op. cost/hour : $8.06 NA <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $208.37 Total fleet cost/hour : $208.37 <br /><.: <br /> <br />MATERIAL QUANTITIES <br /><.: <br />;.;; <br />Initial Swell Loose <br />volume : 3,025 CCY factor : 1.125 volume : 3,403 LCY <br />Source of estimated volume :App. 1.25 ac X 12 in thick <br />Source of estimated swell factor :Cat Handbook Edition 34 <br /> <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors ;:. <br />Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,308.1 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />_. , <br />JOB TIME AND COST <br />County :Delta Abbreviation :none <br />Site :Bowie Exploration Filename :X-12-X06 <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat Hl3) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiff/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 0.95 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br /> <br />Adjusted unit production : 642.94 LCY/hr <br />Adjusted fleet production : 642.94 LCY/hr <br /> <br />0.50 % (pos <br />8, 000 feet <br />Fleet size : 1 Dozers) Total job time : 5.29 Hours <br />Unit cost : $0.324 /LCY Total job cost : $1,103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.