Laserfiche WebLink
Backfilling and Gradinq <br />Rill and gully repair was noted in various <br />locations around the site. A permanent <br />drainageway above pond 6 is under <br />construction (shown at right). <br />To soil <br />Topsoil has been re-spread on the north <br />half of area W-1 and the entirety of area <br />W-3 (areas labeled on the 2006 Annual <br />Reclamation Report Map). <br />Revegetation <br />Areas W-1 and W-3 also <br />appear to have been seeded <br />and mulched followed by <br />dozer tracking. The areas <br />remaining include the road <br />pioneered into the area that <br />accesses the topsoil borrow <br />area. Once heavy <br />equipment no longer requires <br />access and the topsoil <br />borrow area is regraded, this <br />road will be ripped, seeded, <br />and mulched. <br />Overall, the area appeared in <br />good condition for the winter <br />season. <br /> <br />..:~~'' <br />. .. ~•~^•~"~ ,,gy~p ~ J <br />_~.M .~.. ~} ! I <br />!~~ . ' t-' <br />.:~•, <br />North portion of Area W-1 <br />4 <br /> <br />