My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-04_HYDROLOGY - M1984108
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984108
>
2008-01-04_HYDROLOGY - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:32 PM
Creation date
2/1/2008 3:39:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
HYDROLOGY
Doc Date
1/4/2008
Doc Name
Wetland Bank
From
Greg Lewicki and Associates
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Goals, Methods, Maintenance, Monitoring and <br />Performance Criteria <br />The goal of. the Western Gravel Wetland Bank is to convert existing fallow field and <br />mining areas along the Uncompahgre River into a more ecologically valuable habitat area <br />consisting of a mosaic of upland riparian buffers, wet meadows, emergent wetlands and a <br />pond that improve water quality and provide more valuable wildlife habitats. This goal <br />will be achieved physically by grading and planting the subject site in a manner described <br />in the construction plans, and. economically achieved by selling the rights to use the <br />increased habitat and water quality values as compensation. for unavoidable losses of <br />wetlands and other Waters of the U.S. in the Service Area of this project to persons or <br />entities obtaining permits under Section 404 of the Clean Water Act from the U.S. Army <br />Corps of Engineers. Financial surety will be provided by (i) the use of escrow accounts <br />that release funds from the sale of credits upon the satisfaction of various performance <br />goals established in the MBI, (ii) the use of surety bonds, or (iii) a combination of surety <br />bonds and cash encroachments. Specific criteria for the use of these credits will be <br />established by the MBI. Western. Gravel. will provide monitoring and maintenance for a <br />period of ten year following completion of the construction and planting of the site. <br />Monitoring reports shall judge conditions on the site relative to performance criteria <br />established in the MBI. <br />7.0 Service Area <br />The proposed service area of the wetland bank is shown on M.ap 1. The service areas are <br />within the same major watershed as the bank. The extents are limited by elevation and <br />provide coverage below the existing Gunnison Wetland bank service area. Amore <br />formal service area will. be included in the MBI. <br />8.0 Long Term Stewardship <br />After documentation often successful growing seasons (i.e., meeting the performance <br />criteria specified in the MBI), the property o~rned by Western Gravel. Inc. shall be <br />donated to a govermnent agency ofnon-profit. A restrictive covenant shall. be recorded, <br />prior to any sales of mitigation credits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.