Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />005 State :Colorado <br />01/22/2008 County :Montrose <br />WHE Site :Olathe Pit <br />Permit or other job action :Routine Bond Update <br />Task description :Replace topsoil one foot <br />Permitfjob # :M-1984-108 <br />Abbreviation :none <br />Filename : M108-005 <br />over four acres at the North Pond area <br />___ <br />__ <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area :Cat D8R Series 11- 8U (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />Utilization-machine : 100 NA 25 NA NA NA <br />-Ripper attachment : NA NA 5 NA NA NA <br />Ownerhip cost/hour : $80.67 NA $50.59 NA NA NA <br />Operating cost/hour : $117.98 NA $19.36 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $223.59 NA $102.73 NA NA NA <br />Number of units : 1 0 1 0 0 0 <br />Group subtotals : Work : $223.59 Support : $102.73 Maintenance : $0.00 <br />Total work team costihour : $326.32 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 LCY factor : NA volume : 6,453 LCY <br />Source of quantity take-off : (4ac)(43560sf/ac)(1'D) / 27 = 6453.3 cy <br />Source of estimated swell factor : NA <br />