Laserfiche WebLink
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State :Colorado Permit/job # : M-1984-108 <br />Date <br />User <br />12-Jan-2008 <br />County :Montrose <br />WHE Site :Olathe Pit <br />Agency or organization name :DRMS <br />Permit or other job action :Routine bond <br />Task description : Compact backfill to North Pond <br />_..... <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 825G Series !1(2005) Horsepower : 339 <br />Compactor type :Soil -tamping foot Shift basis : 1 per day <br />volume : 24,553 LCY <br />factor : 0.890 volume : 21,853 CCY <br />Source of estimated volume :See work sheet from Task 2 calculations <br />Source of estimated shrinkage factor :NA <br />HOURLY PRODUCTION <br />Unadiusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 5,350 feet <br />8.67 feet <br />5.00 mph <br />12:00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />1 passes <br />8,479.26. CCY/hr <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production <br />7,037.79 CCY/hr <br />Adjusted hourly fleet production : 7,037.79 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 3.11 hours <br />Abbreviation :none <br />Filename :M108-004 <br />Unit cost $0.025 per CCY Total job cost : $556 <br />