Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description :Rough grade portal bench and portal access road <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br />Operating cost/hour : $73.75 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $164.77 Total fleet cost/hour : $164.77 <br />MATERIAL ~ UANTITIES ..................................................................................................................................... <br />Q ................................ ........................... <br />Initial Swell Loose <br />volume : 1,290 LCY factor : NA volume : 1,290 LCY <br /> <br />Source of estimated volume :1.6 acres X 0.5 feet deep <br />Source of estimated swell factor :NA <br /> <br />:.::.::.:n:.;:.;:::::.::::r::::« <br />HOURLY PRODUCTION Job Condition Correctio Facto s ................. .......... :::<. Sou rce:::::.: <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-~ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 364.99 LCY/hr <br /> Adjusted fleet production : 364.99 LCY/hr <br /> <br />JOB TIME AND COST::;::; ::::........................................................................................................................................... ............................... ........................... <br />Fleet size : 1 Dozers) Total job time : 3.53 Hours <br />Unit cost : $0.451 /LCY Total job cost : $582 <br /> <br />