Demolkion Work
<br />• Protect Identification
<br />Agency or organization name: Colorado Division o/ Minerals end Geology
<br />Task #: 200 PermiUjot>ti: C-81-035
<br />Date: 8/13/2007 Abbreviation: N/A
<br />User: TAK Site: King 11 Mine Filename:
<br />Permitting action: RN-OS Source o- unit costs: CIRCES
<br />Task description: Demolish structures, remove materials and debris
<br />STRUCTURE ar ITEM DESCRIPTION
<br />Office/parts warehouse/bathhouse
<br />Superstructure
<br />Floor
<br />Footings
<br />Substation Transformers
<br />Shop building
<br />Superstructure
<br />Floor
<br />Footings
<br />Covered storage (pole barn)
<br />Roof
<br />Fuel storage area
<br /> 3 - 500.gallon tanks
<br /> Containment wall
<br />Rock dust storage silo
<br />Truck scales
<br />Water storage tanks
<br />Mine fan
<br />Truck loadout
<br />Loadout conveyor, 42"
<br />Crusher
<br /> Superstructure
<br /> Floor
<br /> Footings
<br />ReGaim conveyor, 42"
<br />Storage conveyor, 42"
<br />Ground reGaim conveyor, 36"
<br />Slope belt conveyor, 48"
<br />Security building
<br /> SupersWCture
<br /> Floor
<br />Security gate
<br />Culvert (underneath haul road, conveys UDD-4)
<br />Materials stored in boneyard
<br />Loading and transportation
<br />
<br /> Last unit cost update: 2006
<br /> QUANTITY UNIT CIRCES DEMOLITION MENU SELECTION UNIT COST TOTAL COST
<br />ft ft ft If in
<br />60 100 30 180,000 CF Demo/disp./exc. pit - 10K' haul $0.1550 $27,900.00
<br />60 100 6 6,000 SF Demo.disp axis. pit, 6" th. - 200 ft. $1.9700 $11,820.00
<br />2 3 434 320 LF Demo/disp./existing pit, 2'X3' - 200 ft. $23.6300 $7,561.60
<br />2 20 10 400 CF Demo/disp./exc. pit - tOK' haul $0.1550 $62.00
<br />40 60 24 57,600 CF Demo/disp./exc. pit - 10K' haul $0.1550 $8,928.00
<br />80 60 8 4,800 SF Demo.disp axis. pit, 6" th. - 200 ft. $1.9700 $9,456.00
<br />t 2 280 280 LF Demo/disp./exc. pit, 1'X2' - 200 ft. $8.0600 $2,256.80
<br />20 100 3 6 6,000 CF Demo/disp./exc. pit - 10K' haul $0.1550 $930.00
<br /> 3 EA $550.0000 $1,650.00
<br />10 100 6 1,000 SF Demo.disp axis. pit, 10" th. - 50 ft. $3.5800 $3,580.00
<br />11 28 diam 6,773 CF Demoldisp./exc. pit - 10K' haul $0.1550 $1,049.79
<br />40 25 20 20,000 CF Demo/disp./exc. pit -10K' haul $0.1550 $3,100.00
<br />t0 10 diam 2 EA $550.0000 $1,100.00
<br />10 10 10 1,000 CF Demo/disp./appr. landfill -15 mi. haul $0.6690 $669.00
<br />20 20 20 8,000 CF Demo/disp./appr. landfill -15 mi. haul $0.6690 $5,352.00
<br /> 325 325 LF Conveyor, elevated - 5' W x 6' H $36.8600 $11,979.50
<br />25 20 42 21,000 CF Demo/disp./exc. pit - 10K' haul $0.1550 $3,255.00
<br />25 20 6 500 SF Demo.disp axis. pit, 6" th. -200 ft. $1.9700 $985.00
<br />3 2 366 366 LF Demo/disp./existing pit, 2'X3' - 200 ft. $23.6300 $8,648.58
<br /> 75 75 LF Conveyor, elevated - 5' W x 6' H $36.8600 $2,764.50
<br /> 300 300 LF Conveyor, elevated - 5' W x 6' H $36.8600 $11,058.00
<br /> 75 75 LF Conveyor, elevated - 5' W x 6' H $36.8600 $2,764.50
<br /> 250 250 LF Conveyor, elevated - 5' W x 6' H $36.8600 $9,215.00
<br />8 8 10 640 CF Demo/disp./exc. pit - 10K' haul $0.1550 $99.20
<br />8 8 6 64 SF Demo.disp axis. pit, 6" th. - 200 ft. $1.9700 $126.08
<br />80 1 6 480 CF Demo/disp./exc. pit- tOK' haul $0.1550 $74.40
<br />4 diam 70 70 LF Pipe, CMP - 48 in. diam. $27.0100 $1,890.70
<br />100 30 5 15,000 CF Loading/2 mi haul, no salt', -Machine loading $0.42 $6,330.00
<br />Loaclion adjustement: 92.36
<br />Total -Before location adjustment $144,605.65
<br />Total -After location adjustment $133,557.78