Laserfiche WebLink
• CIRCES Cost Estimatinct Software <br /> <br />...................................................... <br />...................................................... <br />...................................................... <br />...................................................... <br />...................................................... TRUCKING -ONLY WORK <br />...................................................................................................................................................... <br />...................................................................................................................................................... <br />...................................................................................................................................................... <br />...................................................................................................................................................... <br />...................................................................................................................................................... <br />PROJECT IDENTIFICATION';:~;:~; . ...................................................................................................................................................... <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 401 State :Colorado Permit/job # : C-81-035 <br />Date : 08/13/2007 County : La Plata Abbreviation :none <br />User : TAK Site :King Coal Mine Filename : C035-401 <br />Permit or other job action : RN-05 <br />Task description : Re-establish SW drainage <br />................................ <br />HOURLY E ~UIPMENT COST;~;:; :..................................................................................................................................................... <br />Q <br />Model :Generic 15-18 cy, 6x4 Shift basis : 1 per day <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour <br />Job utilization <br />$26.79 NA <br />$35.42 100 <br />$21.75 NA <br />Horsepower: 330 <br />Weight (UST) : 10.51 <br />Cost data source : (CRG) <br />Total unit cosUhour : $83.96 Total fleet cosUhour : $167.92 <br />MATERIAL QUANTITIES';:;:~; ............................................................................................................................................................. <br />Initial Swell Loose <br />volume : 50,000 LCY factor : NA volume : 50,000 LCY <br />• Source of quantity take-off :Operator's cost estimate <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION:;:;; :....... ................... ........................ .......................................................... ....................... .......................... <br />Hauling Capacity <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 15.00 LCY <br />Material description : Heaped volume : 18.00 LCY <br />Decomposed rock - 50% Rock, 50% Earth Average volume : 16.50 LCY <br />Rated payload : 63,980 pounds <br />Payload capacity : 22.06 LCY Adjusted volume : 16.50 LCY <br /> Source <br />Truck Cvcle Time : Exchange time (min.) : 0.50 (Cat HB) <br /> Load time (min.) : 2.50 (Cat HB) <br />0.20 mile haul trip at : 20.0 mph (avg.) = Haul time (min.) : 0.60 (mi./mph)x60 <br /> Dump time (min.) : 0.90 (Cat HB) <br />0.20 mile return trip at : 20.0 mph (avg.) = Return time (min.) : 0.60 (mi./mph)x60 <br /> <br /> Total cycle time : 5.10 minutes <br />Job Condition Correction Factors <br />Average site altitude : 7,300 feet Dusted Hourlv Truck Production <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) Unadjusted unit production : 194.12 LCY/Hour <br /> Adjusted unit production : 161.12 LCY/Hour <br />Net job correction : 0.83 Adjusted Fleet production : 322.24 LCY/Hour <br /> <br />' .............................. <br />i <br />................... <br />........................ <br />.......................................................... <br />....................... <br />.......................... <br />JOB COST <br />Fleet size : 2 Truck(s) Total job time : 155.17 Hours <br />Unit cost : $0.521 /LCY Total job cost : $26,056 <br /> <br />