My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-17_PERMIT FILE - C1981035A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2007-08-17_PERMIT FILE - C1981035A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:41 PM
Creation date
1/31/2008 10:06:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
8/17/2007
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> <br />• HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 400 State :Colorado Permit/job # : C-81-035 <br />Date : 08/13/2007 County : La Plata Abbreviation :none <br />User : TAK Site :King Coal Filename :C035-400 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN-05 <br />Task description :Re-establish SW drainages <br />HOURLY<.E::::UIPMENT COST ::: <br />Q :::................................................................................................................................................................................................... <br /> Machine description :Cat 322C L Horsepower : 162 <br /> Weight (MT) : 24.19 <br />• <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $29.53 NA Shift basis : 1 per day <br />Operating cost/hour : $39.00 100 Data source : (CRG) <br />Operator cost/hour : $32.72 NA <br />Total unit cost/hour : $101.25 Total fleet cosUhour : $101.25 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 50,000 CCY factor : 1.165 volume : 58,250 LCY <br />Source of estimated volume :Operators cost estimate <br /> <br />Source of estimated swell factor :DMG estimate <br />............................................................................................................................................................................................................ <br />HOURLY PRODUCTION :::::::............................................................................................................................................................................................................. <br />Excavator Cycle Time (load bucket. swino loaded, dump bucket, swing empt <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.44 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 1.40 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,300 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 287.51 LCY/hour <br />Adjusted hourly unit production : 238.63 LCY/hour <br />Adjusted hourly fleet production : 238.63 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 244.10 hours <br />Unit cost : $0.424 per LCY Total job cost : $24,714 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.