Laserfiche WebLink
For channels requiring riprap, the PADER Method is used to estimate the required rock size. However, <br />based on SCC experience, the PADER Method seems to underestimate the required rock size, so SCC <br />adds 3 inches to the rock Dso size required for design purposes. For further protection of the channel bed, <br />a layer of geotextile fabric is installed prior to placement of the riprap. <br />• <br />• <br />TR-36 8a Revised 08/07 <br />