Laserfiche WebLink
• and Post Mining Cross-Sections. An examination of the cross-sections indicates that the post mining <br />conditions are similar to the premine conditions. <br />The above information demonstrates compliance with the requirements of 4.14.2. These post mining <br />slopes approximate the general nature of the pre-mining topography as demonstrated in 2.10.3(1). <br />Post mining Drainage Channels <br />All drainages that are to be disturbed by mining activities will be reclaimed to approximate the pre-mining <br />configuration and to blend with the undisturbed drainage above and below the area to be reclaimed. The <br />post mining drainage channels will be designed, constructed, and maintained to the following specifications: <br />1. Average stream gradient shall exhibit a concave longitudinal profile to the extent possible; <br />2. Remain in dynamic equilibrium with the drainage basin system without artificial structures; except <br />where necessary to eliminate or reduce erosion; <br />3. Provide separation of flow between adjacent drainages; <br />4. Safely pass the runoff from a 10-year, 24-hour precipitation event (100-year, 24-hour precipitation <br />event for drainages larger than one square mile [Rule 4.05.4(2)(b)]); <br />5. Designed for long-term stability of the landscape; <br />6. The reconstructed drainage channels will eliminate or reduce the severity of nickpoints to the extent <br />possible. <br />The locations of the postmine channels are shown on Exhibit 20-2, Post-Mining Topography and the <br />longitudinal profiles on Exhibit 20-2B, Post-Mining Channel Profiles. The reclaimed drainage channels <br />are designed to be stable and safely pass the 10-year, 24-hour precipitation event (100-year, 24-hour <br />event for drainages larger than one square mile). The designs are based on peak flows calculated by <br />SEDCAD4 software program. The resulting type of channel (i.e., vegetated, rock riprap or vegetated turf <br />reinforcement mat [TRM]) is based on channel slope and velocity. Tab 13, Attachment 13-12, Drainage <br />and Sediment Control, contains the methodology used in determining peak flows and the SEDCAD <br />results for design. <br />The limiting velocity for the vegetated channels is estimated using the tables listed in SEDCAD4 based <br />on a vegetated channel using smooth brome as the vegetation type. Seed mixtures used at the Yoast Mine <br />mimic that of smooth brome closer than other choices. Vegetated channels supplemented with TRM <br />• can handle velocities up to 9.0 feet per second. The postmine channels are typically trapezoidal with <br />3H:1V side slopes. The TRM channels are designed with side slopes of 4H:1V. <br />TR-36 8 Revised 08/07 <br />