Laserfiche WebLink
D. DOWNSTREAM DRAINAGE BLANKET <br />' 1. CONTRACTOR shall perform minor excavation as required for proper <br />performance of the Work. <br />' E. TRENCH DRAIN <br />1. CONTRACTOR shall perform minor excavation as required for proper <br />' performance of the Work. <br />F. INTERCEPTOR TRENCH <br />' 1. CONTRACTOR shall perform minor excavation as required for proper <br />performance of the Work. <br />3.07 MATERIAL PLACEMENT AND COMPACTION <br />A. Placement of fill materials will be performed over the existing dam and existing original <br />ground. CONTRACTOR shall keep COMPANY informed of his operations so that <br />proper inspection and testing can be implemented. No fill material shall be placed on <br />frozen subgrade unless approved by COMPANY <br />B. All materials used in the embanlrnient shall be placed in such a manner that mixing of <br />the various materials with other embankment materials will not occur. If any cross- <br />contamination occurs, CONTRACTOR shall repair contact at no extra charge. This is <br />especially important at the contact between the downstream drainage blanket and the <br />downstream earth buttress general fill. As construction is proceeding up the <br />downstream face of the dam and the left buttress, CONTRACTOR shall maintain <br />drainage blanket material at a minimum height of 3 feet above the downstream earth <br />buttress general fill. <br />C. Due to equipment operation or weather conditions, the surface of the prepared <br />foundation, or the fill or, upstream clay blanket, may become too dry or smooth to bond <br />properly with the next succeeding lift. Evidence of this condition is a dusting or crusting <br />of the surface. CONTRACTOR shall moisten or scarify the surface before the next <br />succeeding lift is placed if this condition develops. <br />D. New fill materials shall be keyed into existing materials so that a uniform connection <br />between the similar materials is made. <br />E. CONTRACTOR shall finish all areas to the lines and grades shown on the Contract <br />Drawings and as approved by COMPANY. All finish grading shall be accomplished <br />using normal mechanical construction equipment. The fmal constructed dam tops shall <br />be covered and fmished with Fill material as shown in the Contract Drawings. Finish <br />grading costs of all materials, shall be included in the cubic yard cost for hauling and <br />placing fill material and will not be paid for separately. <br />' F. Each layer of each zone of the embankment shall be constructed continuously in an <br />approximately horizontal lift for the width and length of the embanlanent at the <br />elevation of the layer. Compaction tests on the constructed layer shall be performed <br />' 02300-9 <br />