My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Record drawings shall have recorded, at a minimum, the following items legibly marked to record <br />actual construction: <br />1. Approved version of all Shop Drawings. <br />2. Locations and depths of onsite utilities under pre-construction conditions, referenced to survey <br />mazkers. <br />3. Measured horizontal and vertical locations of underground utilities, installations, and <br />appurtenances, referenced to permanent surface improvements or survey markers. <br />4. Measured horizontal and vertical locations of underwater utilities, installations and <br />appurtenances, referenced to permanent surface improvements or survey markers. <br />5. Implementation of the Work Plan, and changes to the original Work Plan. <br />6. Measured horizontal dimensions and thicknesses of slope protection installations, both above <br />and below the water surface elevation. <br />7. Geotextile fabric overlapping and jointing. <br />8. Records of reservoir water surface elevation at the time of construction, and any changes to the <br />water surface elevation that occur during the time of construction, referenced to permanent <br />surface improvements or survey markers. <br />9. Changes made by Change Order and all minor field changes of dimension and detail. <br />10. Details not shown on original Drawings. <br />11. Detail any methods, or lack of methods, used for control of water as detailed in Section 02249 <br />of the Specifications. <br />12. Detail any methods, or lack of methods, used for interim erosion and sedimentation control as <br />detailed in Section 02370 of the Specifications. <br />13. Detailed notes and drawings of clearing limits, cleared areas, stockpile locations, and <br />maintenance of the cleared areas. Notes should include CONTRACTOR'S periodic <br />calculations of cleared area in square feet. <br />F. CONTRACTOR shall submit to ENGINEER record documents along with other documentation <br />as required by the Contract Documents. <br />END OF SECTION 01780 <br />01780-3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.