My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01780 <br />PROJECT RECORD DOCUMENTS <br />PART 1: GENERAL <br />1.01 AESCRIPTION <br />A. All Work included in this Section shall be performed in accordance with the following <br />pazagraphs and the provisions of the other Contract Documents. <br />1.02 SUI~IlVIARY <br />A. CONTRACTOR shall maintain at the site (or in CONTRACTOR's possession) one set of record <br />documents including all: <br />1. Drawings <br />2. Specifications <br />3. Change Orders <br />4. Field test records (if applicable) <br />5. Associated permits <br />6. Redline as-built drawings <br />7. Documentation of construction activities as required by the Contract Documents. <br />Records shall be kept in good condition and legibly annotated to show changes made during <br />construction. Store record documents sepazate from documents used for construction, clearly <br />mark, and make accessible to COMPANY at all times. <br />B. CONTRACTOR shall record information on record documents concurrent with construction <br />progress. COMPANY may require CONTRACTOR to improve its performance with regazd to <br />recording information during the construction process. <br />1.03 FINAL SUBMITTALS <br />A. CONTRACTOR shall submit to ENGINEER for proof of specification compliance the Project <br />Record Document Set upon substantial completion prior to certification by Office of State <br />Engineer. <br />1.04 BASIS FOR COMPENSATION <br />01780-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.