My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:27:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Technical Specifications for Monument Dam Preventive Measures
Section_Exhibit Name
Exhibit 76 Report Spring 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be returned to CONTRACTOR, shall be revised by CONTRACTOR to correct the <br />defects noted, and shall be resubmitted to ENGINEER within two (2) calendar days after <br />receipt. <br />F. The schedule shall account for the following restrictions in phasing of the Work: <br />1. Work on the Site shall commence as seasonal conditions dictate. <br />2. CONTRACTOR shall coordinate with COMPANY all activities that will interfere with <br />fencing and gate access to the Site. <br />3. The Work shall be completed including punch-list items germane to Colorado Division of <br />Water Resources dam safety guidelines within the allotted time frame. <br />1.03 PROJECT TIME <br />A. Each project shall begin as soon as possible for each designated project period. Placement of fill <br />material during freezing conditions shall be done only with pre-approval by ENGINEER. <br />CONTRACTOR shall keep COMPANY informed of all times when construction work is to be <br />performed or temporarily suspended. <br />1.04 MEETINGS <br />A. Upon receipt of the Notice-to-Proceed, or at an earlier time if mutually agreeable, ENGINEER shall <br />arrange for aPre-Construction Conference to be attended by CONTRACTOR's Superintendent, <br />COMPANY or designated representative, ENGINEER or designated representative, the State <br />Engineer or designated representative, and representatives of utilities, major subcontractors, and <br />others whose input maybe desired. <br />The purposed of the preconstruction conference shall be to establish a working understanding <br />between the parties and to discuss the construction schedule, shop drawing submittal and approvals, <br />materials testing schedule, construction inspection schedule, cost breakdown of major lump sum <br />items, applications for payment and their processing, submittals, and such other subjects as maybe <br />pertinent to the project. <br />COMPANY or designated representative and ENGINEER shall arrange and conduct progress <br />meetings periodically. These meetings shall be attended by CONTRACTOR'S Superintendent, a <br />representative of the ENGINEER and representatives of all subcontractors, utilities, etc. that are <br />active on the project site. The purpose of these meetings shall be to expedite the Work of any <br />subcontractor or other organization that is not up to schedule, resolve conflicts, and in general, <br />coordinate and expedite the operation of all organizations active at the project site. <br />B. Meetings between COMPANY, or COMPANY'S REPRESENTATIVE and CONTRACTOR will <br />be held as required at the Work site to inspect the progress of the Work; at which time <br />CONTRACTOR is to report on the progress of the job, state problems and proposed solutions, and <br />discuss actions to be taken to keep the job on schedule. If CONTRACTOR believes that a meeting <br />is necessary at some time other than when a meeting is scheduled, CONTRACTOR is obligated to <br />request such a meeting. CONTRACTOR shall immediately notify COMPANY of any prospective <br />delays in the Work. <br />01311-2 <br />