Laserfiche WebLink
h. equipment mobilization and demobilization; usage of laydown and storage areas; <br />maintenance of laydown and storage azeas; restoration of damage to any laydown <br />and storage areas; site cleanup during and upon completion of the Work; preparing <br />and transmitting the required submittals; identifying and locating utilities as <br />necessary for the Work <br />i. obtaining all permits required of CONTRACTOR (those permits not provided by <br />others) <br />control of water and dewatering and filling of the depression uphill of the <br />borrow area <br />k. all other incidental items not specifically paid for but included in the total scope of <br />the Work. <br />B. Clearing, Grubbing, Stripping, and Stockpiling <br />Method of Measurement: Clearing, Grubbing, and Stripping will be measured by the <br />horizontal area in acres (Acres) as determined based on the surveys performed by <br />COMPANY or COMPANY'S Representative. <br />Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to salvage and stockpile existing topsoil, <br />salvage and stockpile vegetation and brush for restoration, and clear all deleterious <br />nonspecified materials for proper performance of the Work for those areas outside the <br />existing dam footprint where the Work is to be constructed on the basis of a unit price per <br />acre staked, cleazed, grubbed and stripped to the nearest tenth of an acre, all in accordance <br />with the Drawings and Specifications. No payment will be made for areas which have <br />been previously cleared. <br />C. Borrow Material Source Development <br />Method of Measurement: Borrow Material Source Development will be measured by the <br />cubic yard as determined based on the surveys performed by COMPANY or <br />COMPANY's Representative. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to develop the borrow material source, <br />stockpile the material, and develop the material to be in accordance with the requirements <br />of the Specifications on the basis of a cubic yard as existing in-place as determined based <br />by surveys of the borrow area, all in accordance with the Drawings and Specifications. No <br />payment will be made for materials otherwise excavated and salvaged as borrow. <br />D. Riprap Material Source Development <br />1. Method of Measurement: Riprap Material Source Development will be measured by the <br />cubic yard as determined based by the surveys performed by COMPANY or <br />COMPANY'S Representative. <br />2. Basis of Payment: CONTRACTOR will be paid for furnishing all labor, equipment, and <br />materials and performing all operations necessary to develop the borrow riprap source, <br />01270-3 <br />