Laserfiche WebLink
r <br />As mentioned above, we would like to follow up with a conference call or meeting on <br />any technical issues that may require additional review and discussion prior to finalizing <br />and resubmitting the application. Greg Lewicki (303-346-5196, gregnlewicki.biz) and I <br />(303-974-2146, ffilas ~Ca. energyfuels.com) would also be happy to answer any questions <br />you may have during your review and provide additional information, as necessary. Greg <br />is currently working on revisions to the reclamation and bond estimate based on the <br />revisions proposed in this response. <br />Sincerely, <br />-'?r _ <br />Frank Filas, P.E. <br />Environmental Manager <br />Attachment A -Geologic Interpretation of Beaver Mesa Water-Bearing Zones <br />Attachment B -Salt Wash Sandstone Test Resul#s <br />Attachment C -New and Revised Maps <br />Attachment D -Whirlwind Ore Production Schedule <br />Attachment E -Whirlwind Bulkhead Seal Figures <br />Attachment F -Engineered Liner Design for the Ore Stockpile Pad <br />Attachment G - PMP Flow Calculation <br />Attachment H - Packrat Contingency Bulkhead Seal Cost Estimate <br />Attachment I -Whirlwind Bulkhead Seal Cost Estimate <br />Attachment J -Concrete Structure Details <br />Cc: Scott Gerwe, BLM <br />Greg Lewicki <br />Gault Group (S. Glass, R. Garrigues) <br />Energy Fuels (S. Antony, Z. Rogers, D. White, T. White) <br />C:~trtL)' hlli.'.~ti 1~CSUtFI't:d`: f.~Ul'Iliil'illl~l(1 ..}=8 t I~~it>n .Lj~_-ulerard: `tiuii~~ (il)O 22 <br />.t1~{C~trini~, t ~(} $t) I :? 1'hi~1i<.: i(1 ..i) % 121.4(} <br />