My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-16_PERMIT FILE - C1981044
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981044
>
2007-11-16_PERMIT FILE - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:28 PM
Creation date
1/16/2008 2:00:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
11/16/2007
Doc Name
Cost Estimate
Section_Exhibit Name
Appendix A TR34 RCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action :TR34 <br />Task description :Cover non-waste disposal facility with 2 ft. cover <br />................................................................................................................................................................. . <br />HOURLY:E>:::UIPMENT ~COST:;:.>;• ::...........................................................................:..........................................................,................................................ <br />Q <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />volume : 14,815 CCY <br />factor : 1.125 volume : 16,667 LCY <br />Source of estimated volume :TR34 adeq. response letter, 10/31/2007 <br />Source of estimated swell factor :Caterpillar Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 75 feet <br />Unadjusted hourly production : 2,105.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 1.00 % (~ <br />Average site altitude : 6,350 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shiff/da~ <br />Spoil pile : 0.80 (fnd-rt) <br />Push gradient : 0.99 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.47 <br />Adjusted unit production : 989.89 LCY/hr <br />Adjusted fleet production : 989.89 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 16.84 Hours <br />Unit cost : $0.272 /LCY Total job cost : $4,540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.