Laserfiche WebLink
the Topaz Mine in 2007; however, routine maintenance of the berm and catchment at the base of <br />the Waste Rock Area was completed in the fall of 2007. <br />A Weed Management Plan consistent with the requirements of San Miguel County and the BLM <br />was prepared for the Sunday Mines. Noxious weed control was completed using pesticide for <br />halogen and knapweed. Figure 1 shows a map of the weeds encountered and the pesticide <br />application areas. Pesticides were applied in 2007 on May 31, June 5"' and 20~', August 6`" 7`n <br />and 20~'. <br />Exploration drilling will take place concurrent with mine operations at the Topaz Mine, and it is <br />anticipated that 30 exploration holes will be drilled in the Topaz Mine claims commencing in <br />March of 2008 and an additiona130 exploration holes will be drilled in Sunday Mine claims in <br />the late fall of 2008. All exploration activities will be completed under a statewide prospecting <br />bond and written notice has been provided to DRMS (Apri125, 2007) and the BLM. <br />