Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1993-059 <br />INSPECTION DATE 10/26/2007 <br />INSPECTOR'S INITIALS DEZ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />~ DATE <br />1 • At the present time the Division does not have a copy of the current approved Substitute Water <br />Supply Plan on file with the Office of the State Engineer. The most recent submission the Division 3 / 31/ 2008 <br />has of this document expired on April 30, 2007. <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): AR <br />The Division requires a copy of the current Substitute Water Supply Plan on file with the Office of - - - <br />the State Engineer to be submitted to the Division on or before March 31, 2008. <br />~ 2• During the scheduling of this inspection difficulties arose in finding a current point of contact for this <br />3 / 31/ 2008 <br />site. - - <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): AR <br />Please provide the Division with a list of up_-to-date points of contact (including the names <br />addresses and phone numbers) for the person or persons most likely to: accompany an inspector <br />(inspection contact) answer questions regarding the status of current operations (operator <br />contact) and the person to whom requests for further information or documents should be <br />directed (permitting contact) on or before March 31, 2008. <br />3. <br />/ / <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): - <br />