Laserfiche WebLink
D. <br />E. <br />During mining, the prevailing hydrologic balance of the affected land and the <br />surrounding area will not be adversely affected. <br />The following is an estimate of reclamation costs. Reclamation costs are limited <br />to shaping the site, and re-vegetation based on single acreage. <br />Shaping: (9.99 Acres) <br />Shaping the pit is done with a dozer. It is estimated that a dozer and operator can <br />shape 0.2 acres per hour of reclaimed pit. <br />Mobilization (from Meeker) <br />Equipment cost: <br />Labor cost: <br />Total Shaping <br />$60.00 per hour or $300.00 per acre <br />$30.00 per hour or $150.00 per acre <br />$450.00 per acre <br />Re-vegetation: 9.99 Acres <br />Seed and application <br />TOTAL RECLAMATION COST: <br />$700.00 per acre <br />$11488.50 <br />