When approved by the DMG, ponds 6 and 10 will be reclaimed and <br />Coal Canyon will be realigned as shown on Exhibit 9C. The new <br />alignment was moved to the right so it is more in line with the dip <br />section. The proposed alignment meanders through reclaimed <br />ponds 6 and 10. The material balance for this work is presented in <br />Tab 14-1. <br />South Fan <br />The South Fan area was reclaimed in 2000. Final contours for the South <br />Fan area are approximately the original contours shown on Exhibit SL-16- <br />009, Tab 13. The borrow area shown on Exhibit SL-16-009 was used to <br />backfill the shaft. The borrow area was graded to blend in with exiting <br />contours. After salvage operations, the remaining concrete shaft collar <br />and structural foundations were broken up and pushed into the shaft. The <br />shaft was backfilled to within approximately 5' feet of the surface and the <br />shaft sealed with a concrete plug approximately 5' thick. The fan bench <br />was backfilled with material filled on the outside edge of the bench and <br />with material from the two overburden stockpiles nearby. The most <br />suitable plant growth material was placed on the fill last and amended as <br />necessary to promote revegetation. The portion of Access Road 3 <br />leading into the fan site was eliminated by grading it to match the adjacent <br />topography. Silt fences are being utilized as alternative sediment control <br />and placed as shown on Exhibit SL-16-009 <br />14-11 i (Rev. 09/07) <br />