My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (20)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:02:11 PM
Creation date
1/11/2008 9:38:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/19/2007
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 19 December 2007� <br /> Pg 6/6 <br /> Revegetation: - In addition to the 85.6 acres that were seeded in the East Pit (as <br /> mentioned above in the Topsoil section) Tony indicated that he seeded the West <br /> Taylor Pond embankment, topsoil stockpile and borrow area. <br /> Excess Spoil: - The reclaimed portions of the West Pit spoil pile were covered with <br /> snow but appeared to be well vegetated and stable at the time of the inspection. <br /> Runoff from this portion of the pile goes into the West Pit pond. No erosional problems <br /> were noted of the pile at the time of the inspection. The upper portion of the pile is <br /> truck-dumped spoil. This part of the pile appeared to be stable at the time of the <br /> inspection. The reclamation plan calls for the top 75 feet of this pile to be hauled to <br /> the West Pit to achieve AOC. <br /> - The Streeter fill was covered with snow but it appeared to be well vegetated and <br /> stable at the time of the inspection. No erosional problems were noted on the fill. <br /> This pile has gone through a Phase II bond release. The fill was well vegetated at the <br /> time of the inspection. <br /> - The Section 16 fill was inaccessible at the time of the inspection (and will probably <br /> remain so until April or May). <br /> Overall, the operations and reclamation at the Colowyo Mine are being conducted <br /> in accordance with the approved plans contained within the PAP. The operation is <br /> doing a good job ensuring compliance with all of the Rules. <br />
The URL can be used to link to this page
Your browser does not support the video tag.