My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (20)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:02:11 PM
Creation date
1/11/2008 9:38:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/19/2007
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 19 December 2007 <br /> Pg 5/6 �-� <br /> Topsoil (cont.): This multiple "handling" of the topsoil increases the chances that <br /> some of the properties may be compromised. Colowyo must ensure that the topsoil <br /> stripping operations are conducted in such a way that none of the chemical and/or <br /> physical properties are damaged. If the conditions become wet and/or muddy, <br /> Colowyo must suspend stripping operations in order to protect the topsoil resource. <br /> - Tony indicated that the final number of acres that had topsoil spread and were <br /> reseeded this year was 85.6 acres. This includes approximately 25 acres that were <br /> topsoiled but not seeded last year. All of these acres are in the East Pit. <br /> General Mine Plan Compliance: - The 101 dragline is on the East Pit highwall <br /> performing reclamation (although it was not actively working at the time of the <br /> inspection). <br /> - The 102 dragline was in the West Pit removing overburden on the F-Seam. <br /> - The 103 dragline was in the West Pit removing overburden on the B-Seam. <br /> - The 114 shovel operation was currently working on removing the A-Seam <br /> overburden in Taylor Draw. <br /> - The 115 excavator was removing X-Seam overburden in the X-Pod area. This is the <br /> area at the south edge of the Section 16 Pit that was approved for mining with the <br /> approval of Technical Revision 65. The operator was also removing X-Seam coal <br /> from this area. This is the last of the X-Seam coal at the mine, as all of the X coal has <br /> been mined from the West Pit. <br /> - The operator was removing and hauling F-Seam coal from the West Pit at the time <br /> of the inspection. <br /> - The operator was drilling and loading explosives in the B-Seam overburden for a <br /> shot. <br /> - The operator had a contractor (Krule) working in the West Taylor drainage, around <br /> the location of the West Taylor fill removing and burning the trees in advance of the <br /> topsoil stripping operations. This operation has finished. The operation did a good job <br /> of removing the trees and leaving the topsoil in good condition. <br /> - Kiewit has completed the large water tank bench and the ready-line for the haul <br /> trucks. Bower had some of their CAT 773's parked there at the ready line at the time <br /> of the inspection. This ready line will be used for the South Taylor Pit, as the other line <br /> is at the north end of the mine. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Fish and Wildlife: - There was a small herd of elk on the large topsoil pile just east of <br /> the work are pond (just below the facilities area). There were also signs of very heavy <br /> use of many of the other areas of the mine, although few animals were seen at the <br /> time of the inspection. <br /> - There were two dead elf along the haul road to the Gossard Loadout. These <br /> animals were hit by haul trucks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.