Laserfiche WebLink
need to explicitly state which structures and facilities will be utilized under the NOI. Any <br />structures, facilities or disturbances that are utilized by COAG will become the responsibility of <br />COAG and will need to be bonded for and ultimately reclaimed. In addition; <br />• Note the existing structures that exist within the 3.5 acre area and provide the dimensions, <br />construction material, and an estimated cost to remove the structures in conformance with <br />the approved reclamation plan. <br />• Explain the work associated with the construction of new facilities and the modification of <br />all existing structures, roads and drainage structures. <br />• Provide the dimensions, construction and location for any new structures proposed under the <br />NOI. <br />Once the above- mentioned items have been submitted to the satisfaction of the Division, the Division will <br />estimate the cost to reclaim the site based on the reclamation plan proposed by the applicant. You will be <br />notified of the required financial warranty prior to the decision date. <br />Please be advised that COAG Prospecting Project; File No. P-2007-069 maybe deemed inadequate, <br />and the application maybe denied on January 25, 2008 unless the above-mentioned adequacy <br />review items are addressed to the satisfaction of the Division. If you feel more time is needed to <br />complete your reply, the Division can grant an extension to the decision date. This will be done <br />upon receipt of a written waiver of your right to a decision by January 25, 2008 and request for <br />additional time. This must be received no later than the deadline date. <br />If you have any questions, please do not hesitate to call me at 303-866-4943. <br />" cerel'y, <br />Erica S. Crosby <br />Environmental Protection Specialist <br />Enclosure(s) <br />cc: Carl Mount; DRMS <br />Reinhold Zimbelman; COAG Corporation <br />