Laserfiche WebLink
overtopped the East Collection Channel at the north end of topsoil stockpile 4. The operator's <br /> representative explained that straw waddles were going to be placed where needed on the North Pit <br /> backfill to stop rill growth. This work would satisfy the work in this area that was identified during the <br /> SL-03 bond release inspection. <br /> Photo 1 —Newly regraded East Collection Ditch at north end of topsoil stockpile 7. Two culverts (the <br /> subject of CV 2005-007) have been removed at this location, resulting in this continuous ditch. <br /> ZO <br /> Y ,may, <br /> j:. <br /> Photo 2—Boulder runoff barrier installed on north edge of North Pit backfill. Equipment is on <br /> backfill; left side of photo is sandstone dip-slope. <br /> 5 <br />