Laserfiche WebLink
RESOURCES LETTER TO THE DIVISION, DATED FEBRUARY <br />9, 2001, INCLUDING INSTALLATION OF PIEZOMETERS OR <br />OTHER DOWN-HOLE INSTRUMENTATION. <br />2. THE RESULTS OF THE SEISMIC INVESTIGATION AND <br />EVALUATION OF THE STRUCTURE, INCLUDING <br />RECOMMENDATIONS FOR ANY ADDITIONAL <br />INSTRUMENTATION. <br />3. THE INSTALLATION OF ANY ADDITIONAL <br />MONITORING INSTRUMENTATION, SEISMIC OR <br />OTHERWISE, IN ACCORDANCE WITH THE FINAL <br />INSTRUMENTATION PLAN. <br />4. A REPORT OF ALL BASELINE DATA AND A <br />DESCRIPTION OF THE BASELINE CONDITIONS WITHIN A 1 <br />MILE RADIUS OF THE DAM. <br />5. A FINAL REPORT AND IMPACT ANALYSIS PRIOR TO <br />ANTICIPATED MINING WITH A PROJECTED ANGLE OF <br />DRAW THAT IS WITHIN ONE MILE OF THE DAM. <br />10. PRIOR TO AFFECTING USDA-FOREST SERVICE (FS) WATER <br />RIGHTS BY MINING, THE OPERATOR WILL SUBMIT TO THE <br />DIVISION FOR APPROVAL, A TECHNICAL REVISION THAT <br />INCLUDES 1) A REVISED MAP 23, "WATER RIGHTS <br />LOCATION" AND REVISED TEXT THAT DESCRIBE THE FS <br />WATER RIGHTS WITHIN THE PERMIT AND ADJACENT <br />AREA, AND 2) VERIFICATION THAT ACOURT-APPROVED <br />WATER AUGMENTATION PLAN IS IN EFFECT FOR THOSE <br />FS WATER RIGHTS WITHIN THE PERMIT AND ADJACENT <br />AREA THAT MAY BE CONTAMINATED, DIMINISHED OR <br />INTERRUPTED BY MINING. <br />14. AN ACCEPTABLE SHRUB PLANTING PLAN AND WOODY <br />PLANT DENSITY STANDARD MUST BE SUBMITTED BY <br />BOWIE RESOURCES LIMITED. THE PLANTING PLAN AND <br />DENSITY STANDARD MUST BE DEVELOPED IN <br />CONSULTATION WITH THE COLORADO DIVISION OF <br />MINERALS AND GEOLOGY AND THE COLORADO DIVISION <br />OF WILDLIFE. <br />