Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: September 28, 2007 <br />Permit No: C-1996-083 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />9. A DETAILED SUBSIDENCE STUDY FOR TERROR CREEK <br />RESERVOIR DAM (BRUCE PARK DAM) MUST BE <br />COMPLETED AND APPROVED PRIOR TO THAT TIME WHEN <br />THE PROJECTED ANGLE OF DRAW OF MINING IS WITHIN <br />ONE MILE OF THE BRUCE PARK DAM. THE STUDY WILL <br />ESTABLISH BASELINE CONDITIONS, POTENTIAL MINING- <br />INDUCED SEISMICITY AND POTENTIAL TRANSLATED <br />EFFECTS TO THE DAM. <br />MINING WITH A PROJECTED ANGLE OF DRAW THAT IS <br />WITHIN ONE MILE OF THE TERROR CREEK RESERVOIR <br />(BRUCE PARK DAM) WILL NOT BE APPROVED UNTIL ALL <br />NECESSARY MONITORING DATA, ANALYSES, REPORTS <br />AND SUBSIDENCE CONTROL PLAN DETAILS ARE <br />APPROVED BY THE DIVISION AND IT IS SHOWN THAT <br />SUCH MINING WILL NOT ADVERSELY IMPACT THE DAM. <br />BOWIE RESOURCES WILL SUBMIT A TECHNICAL <br />REVISION TO THE PERMIT ADDRESSING THE <br />INVESTIGATION, DATA COLLECTION, ANALYSIS, AND <br />MONITORING PLAN TO ENSURE THE SAFETY AND <br />INTEGRITY OF THE TERROR CREEK RESERVOIR DAM <br />(BRUCE PARK DAM). THE REVISION MATERIALS WILL <br />INCLUDE, BUT NOT BE LIMITED TO, DATA, A TECHNICAL <br />REPORT, COMPLIANCE SCHEDULES, A SUBSIDENCE <br />CONTROL PLAN, A DETAILED MONITORING PLAN <br />SPECIFIC TO POTENTIAL SEISMICITY AND ANY OTHER <br />POTENTIAL IMPACTS INDUCED BY LONGWALL MINING. <br />THE TECHNICAL REVISION SHALL ADDRESS: <br />1. THE RESULTS OF THE DRILLING PROGRAM, AS <br />REFERENCED IN THE COLORADO DNISION OF WATER <br />