My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-17_PERMIT FILE - C1981035 (21)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2007-08-17_PERMIT FILE - C1981035 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:40 PM
Creation date
12/6/2007 11:10:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
PERMIT FILE
Doc Date
8/17/2007
Doc Name
Environmental Assessments
Section_Exhibit Name
KI Appendix 13
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• complies with the permitting requirements and that the coal <br />mining operation will meet the approved permanent program's <br />performance standards. If it does comply, Colorado DMG issues <br />the lessee a permit to conduct coal mining operations. OSM, <br />BLM, and other federal agencies review the permit application <br />package to ensure that it complies with the terms of the coal <br />lease; the requirements of the Mineral Leasing Act of 1920; <br />the National Environmental Policy Act of 1969; and other <br />federal laws and their attendant regulations. OSM recommends <br />approval, approval with conditions, or disapproval of the <br />mining plan to the Assistant Secretary - Land and Minerals <br />Management. Before the mining plan can be approved, BLM and <br />the surface-managing agency (if other than BLM) concur with <br />this recommendation. <br />Colorado DMG enforces the performance standards and permit <br />requirements during the mine's operation and has primary <br />authority in environmental emergencies. OSM retains oversight <br />responsibility for this enforcement. BLM has authority in <br />those emergency situations where Colorado DMG or OSM <br />inspectors cannot act before environmental harm or damage <br />occurs. <br />Background <br />The Hay Gulch area has historically been a coal producing <br />• area. Numerous abandoned mines exist throughout the Hay Gulch <br />drainage. However, except for the King Coal mine, there are <br />currently no active coal mining operations in the Hay Gulch <br />area or in LaPlata County. <br />National King Coal currently has approximately 594 acres under <br />Federal lease, approximately 160 acres under State lease and <br />approximately 280 acres under private lease which afford <br />minable coal reserves to the operation. All of these lease <br />areas are currently permitted with Colorado DMG. The surface <br />facilities at the mine are located on approximately 8 acres of <br />the private leased acreage. <br />The total remaining minable reserves in coal bed 1 as of <br />January 1, 1996 contained on leased lands controlled by <br />National King Coal is approximately 1.2 million tons. Most of <br />the mine's remaining Federal coal reserves are contained in <br />COC 49465 and C-20125. Except for chain pillars, lease P- <br />058300 was mined-out in 1982 but is part of an LMU to provide <br />a right-of-way to access more recently acquired fee and <br />Federal reserves. <br />To provide for their current market demands, National King <br />Coal produces 200,000 to 250,000 tons of coal annually. Total <br />mine production for 1995 was 208,642 tons. Federal production <br />for 1995 was 154,900 tons. There was no production from the <br />• 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.