Laserfiche WebLink
TASK 1 Building Demolition <br />• <br />• <br />STRUCTURE or ITEM <br />DESCRIPTION DIMENSIONS DEMOLITION <br />DESCRIPTION QUANTITY UNIT UNIT <br />COST TOTAL <br />COST <br /> <br />Office Trailer 24x60'xl0* Replaces tires, remove <br />interiorjoints, haul2-12' <br />ide trailers to Durango. 2 units EA 750 + <br />$2.OU/ <br />mile RT $1,600 <br /> <br />Portal Building 92;~c20'x8' Demolish dump on-site 1,920 CF $0.55 $1,125 <br /> <br />Main Conveyor 40 ~F Conveyor, elevated - <br />5'Wx 6'H 40 LF $30 $1,200 <br />Scale House O'x42'x10' Doze & bury at highwall 16,800 CF $0.55 $9,240 <br />Tipple Building (Pole Barn <br />Construction-12 Steel Poles 60'x65'x1' <br />Roof Vol. .Demolish w/dozer- <br />bu at hi h~ wall 3,900 CF $0.55 $2,145 <br />Tipple Lean-to Shed 18'x45'x8' <br />Roof Vol. Demolish w/dozer- <br />bury on-site 6,480 CF $0.55 $3,564 <br />East Bins 15`x25x50' <br />4 section Bins Disassemble bin, cut- <br />torch 12 uprights- bury <br />at hi hwall 64 man hrs H 0 $1,600 <br />Crusher - 15'x1 Tx40' Demolish = bury at <br />hi hwall 10,200 CF $0.55 -$5;610- <br />Mine Fan x6'x30',4x6'x10 Demolish -bury at <br />highwall 960 CF $0.55 $528 <br />Etath House ~ O'x60'x18' Doze & beat hic hwall 42,200 CF $0.1163 $5,023 <br />Stacker Conveyor 300 LF Conveyor elevated- <br />5'Wx 6'Fi .300 LF $30 $9,000 <br />Stacker Tower #1 10'x20'x50' Demolish - bury at <br />hi hwall 10,000 CF $0.55 $5,500 <br />Stacker Tower #2 8'xl2'x25' Demolish -bury at <br />highwall 2,400 CF $0.55 $1320 <br /> <br />Remove Two 500 Gallon Gas <br />Tanks 2@500 Gallons Excavat~a & load 2 EA $335 $670 <br /> <br />Burn Trash and Debris, Bury <br />On-Site ssume 150 CY Doze & bury at highwall '150 CY $1.00 $150 <br /> <br /> <br /> <br /> <br /> <br />TOTAL _ $48,275 <br />• <br />