My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-17_PERMIT FILE - C1981035A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2007-08-17_PERMIT FILE - C1981035A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:42 PM
Creation date
12/6/2007 11:09:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/17/2007
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />~1 <br />COST SUMMARY <br />ask # Description Hours Direct Costs <br />1 Structure demolition 116.4 $48,27 <br /> # 3 UPPER FACILITIES AREA -PREVIOUSLY DISTURBED <br /> Rip Upper Facilities Area 15.8 $1,99 <br /> Push 12" coaly-waste to highwalls 11.6 $1,40 <br /> Haul tapsoil/growth medium to Upper Facilities Area 9.6 $1,433 <br /> Finish grade 2.2 $16 <br />6~` Apportioned revegetation costs 1.96 acres ~:::~~7r. <br /> # 4 HIGHWALL AREA -PREVIOUSLY DISTURBED <br />7 Haul topsoil/growth medium to highwall 4.7 $69 <br />8 Doze fill into portals, rough-grade fill slope and topsoil 1.9 $23 <br /> Apportioned revegetation costs 1.31 acres ~73 ~" <br /> # 2 LOWER FACILITIES AREA -PREVIOUSLY DISTURBED <br />10A & B Rip & final grade w/12H grader 2.5 $18 <br />11* Apportioned revegetation costs 1.19 acres ""'-' <br /> # 5 RECLAIMED REFUSE AREA -PREVIOUSLY DISTURBED <br />12 Doze 3.5' fill (Completed) 4.3 $49 <br />13 Doze growth medium @ 6" (Completed) .6 $70 <br />14* Apportioned revegetation costs 0.58 acres (Completed) $28 <br /> AREA =CURRENT STANDARDS -- <br />15 Haul 3.5' fill to refuse pile 33.6 $4,99 <br />16 .Rough grade fill 1 $7 <br />17 Haul topsoil to refuse pile 8.4 $1,25 <br />18 Finish grade topsoil 1.2 $90 <br />19* Apportioned revegetation costs 1.08 acres .~..,,. <br /> TOPSOIL BORROW AREA <br />20 Finish grade = 2 acres disturbance 2.4 $16 <br />21* Apportioned revegetation costs 2.0 acres ~ ~~:± <br /> SEAL VENTS <br />22 Seal vent hole {Completed) 4 $1,44 <br /> # 1 EAST & WEST POND AREA -PREVIOUSLY DISTURBED <br />23 Reclaim East and West ponds 23.2 $2,80 <br />24 Construct final drainage channel, riprap & filter fabric 17.0 $3,91 <br />25~* Apportioned revegetation costs 1.86 acres ~~~•'~`- <br /> TOTAL REVEGETATION COSTS <br />26*~* Includes all areas @ 10.7 acres 16 $4,970 <br /> MOB/DEMOB <br />27 Initial Mob/Demob costs 6.2 $2,97 <br />28 Pond removal, ditch construction, revegetation Mob/Demob 4.2 $65 <br />29 Site maintenancelequipment & labor costs. 5 trips in 10 years 40 $5,63 <br /> Total hours 8~ direct costs 326.8 $83,92 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 1.55% $1,301 <br /> Performance bond: 1.05% $881 <br /> Job superintendent :'rZ hrsx$36.25lhr 163.4 $5,923 <br /> Profit: 10% $8,392 <br /> Total Overhead & Profit: $16,49 <br /> CONTRACT AMOUNT (Direct + O&P) $106,65 <br /> ENGINEERING & PROJECT MANAGEMENT <br /> Engineering and bid preparation 4.25% $3,567 <br /> Reclamation management 5.00% $4,196 <br /> Total indirect costs $7'76 <br /> TOTAL BOND AMOUNT (Direct + Indirect) $108,18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.