Laserfiche WebLink
Table No. 5 <br />Connell Resources, Inc. <br />Combined SWSP - Stute Pit and Tlmnath-Connell Pit <br />Water Balance for CRTs Combined SWSP during Water Years 2007 and 2008 <br />Prepared By: Applegate Group, Inc. <br />Date Revised: 8127/2007 <br />AG Job #: 05-114 <br /> <br /> <br /> <br />_ <br /> <br /> <br /> <br /> <br /> <br />. - <br /> <br />.Farm Headpate <br />Diversions Mm °•: <br /> <br /> <br /> <br /> <br />RFRecOarye Pa[ld: <br />...: {acre-feet! : ° <br /> <br />... <br />~. <br /> <br />tapped Timmy; <br />6ui~Hea(~r <br /> <br /> <br /> <br /> <br />t)siRrery <br />lam} K' <br /> <br /> <br />- .. . <br /> <br /> <br />, <br /> <br />~~~ <br /> <br /> <br />Cair-t ~' <br />(? <br /> <br />i <br />,. C <br />. <br />x <br /> <br /> <br /> <br /> <br />ettArr <br />€lows <br /> <br />., <br />,t~~ <br />~ <br /> <br />7afip1= <br /> <br /> <br /> <br /> <br /> <br /> <br />it) <br /> <br /> <br />E <br /> <br /> <br /> <br /> <br /> <br />.: <br /> <br />Realizssdst RiveF <br />E1 ~ <br /> <br />y <br />Nov-O6 22.9894 7.40 3.46 13.32 <br />Dec-O6 20.7710 6.79 2.65 12.34 <br />Jan-07 18.8821 6.14 2.32 11.30 <br />Feb-07 17.2171 5.56 2.30 10.15 <br />Mar-07 15.7233 5.02 2.64 8.76 <br />r-07 67.96 14.9446 5.21 3.29 7.09 <br />Ma -07 110.86 193372 10.92 3.93 5.06 <br />Jun-07 61.90 27.7401 11.55 4.86 11.85 <br />Jul-07 5.92 32.1534 14.90 5.41 12.32 <br />Au -07 30.1915 13.82 5.18 11.61 <br />Se 7 26.4124 11.27 4.11 11.42 <br />Oct-07 233099 8.64 3.15 11.87 <br />Total 246.64 269.67 62A7 44.76 43.30 <br />Nov-07 20.9031 7.40 2.27 11.23 <br />Dec-07 18.9272 6.79 1.64 10.49 <br />Jan-08 17.2247 6.14 1.44 9.64 <br />Feb-08 15.7174 5.56 1.51 8.65 <br />Mar-08 143562 5.02 1.94 7.40 <br />r-08 72.00 13.7309 5.21 2.65 5.87 <br />Ma -08 88.00 183173 10.92 3.36 4.04 <br />Jun-08 10.00 24.8832 11.55 4.34 8•~ <br />Jul-08 10.00 253185 14.90 4.94 5.49 <br />Au -08 5.00 23.0398 13.82 4.76 4.46 <br />Se 5.00 20.9003 11.27 3.72 5.90 <br />Oct-08 2.59 19.1180 8.64 2.80 7.68 <br />Total 192.59 232.44 62.47 44.76 35.37 <br />(A) Actual recharge diversions in Water Year 2007 and projected recharge diversions in Water Year 2008 <br />(B) Lagged timing of fans headgate delivery realized at the Poudre River in Water Years 2007 and 2008 from recharge model run (Appendix C) <br />(C) Inigation season return flan component for the 2.0 Box Elder Ditch shares from Table No. 4 <br />(D) Winter ntum flows for the 2.0 shares from Table No. 4 <br />(E) Total combined lagged mining depletions from Water Years 2007 and 2008 <br />(F) Monthly excess or deficit realized at the river, (B}(C}(D}(E) <br />