Laserfiche WebLink
TABLE 1 <br /> <br /> <br />MONTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br /> <br />CO NNELL RESOURCES INC. COMBINED PLAN-STUTE PIT W ELLINGTON DOWN S TIMNATH-CONNELL <br /> PIT <br /> <br /> <br /> <br /> <br />_ <br />TIMNATH <br />TOTAL ACCRETIONS& <br />DEPLETIONS FARM HEADGATE <br />DELIVERY LAGGED ACCRETIONS <br />FROM RECHARGE MONTHLY <br /> <br />_ <br />MONTH <br />STUTE PIT <br />LAGGED <br />DEPLETIONS <br />AF <br />CONNELL PIT <br />LAGGED _ <br />DEPLETIONS <br />AF <br />LAGGED <br />COMBINED <br />DEPLETIONS <br />AF <br />FROM <br />2 BOX ELDER <br />SHARES <br />AF <br />OF 2 BOX ELDER <br />SHARES INTO <br />RECHARGE <br />AF <br />OF BOX ELDER <br />SHARES ACCRUING <br />TO THE RIVER SUMMER <br />RETURN <br />FLOW <br />OBLIGATION <br />WINTER <br />RETURN <br />OBLIGATION <br />EXCESS <br />OR DEFICIT <br />AT RIVVER <br /> <br /> <br />NOVEMBER (07) <br />DECEMBER 07 <br />( ) <br />1 <br />0.45 <br />2 <br />1,82 <br />3 <br /> <br />2.27 <br /> <br />4 <br />-7.05 <br /> <br />5 <br />0.36 AF <br /> <br />6 <br />20 <br />90 <br />AF <br />7 <br />AF <br />g <br />AF <br />9 <br /> <br /> <br />JANUARY(08) <br />FEBRUARY(08 0,41 <br /> <br />0.37 <br />1.24 <br />1,07 <br />1.65 <br />1 ~ <br />-6.79 <br />~ 14 . <br />18.93 <br /> <br />17 <br />22 7.40 <br /> <br />6.79 <br />11.23 <br />10.49 <br />) <br />MAR_CH(08) <br />APRIL(08) 0.33 <br />0.30 1.18 <br />1.63 1.51 <br />1.93 -5.56 <br />-5 02 . <br />15.72 <br />14 <br />36 6.14 <br />5.56 9.64 <br />8.65 <br /> <br />MAY 08 <br />( <br />) 0.27 2.38 2.65 <br />-2.89 <br />2.32 . <br />13 <br />73 5.02 7.41 <br /> <br />_ <br />JUNE(08) <br />JULY(08) <br />AUGUST <br />OS <br />0.25 <br />0.22 <br />0.20 <br />3.11 <br />4.12 <br />4.73 <br />3.36 <br />4,34 <br />4.93 <br />14.64 <br /> <br />43.65 <br />25.56 <br /> <br />58 <br />54 . <br />18.32 <br /> <br />25 <br />32 <br /> <br />10.92 5.21 <br />5.87 <br />4.04 <br />8.99 <br />( <br />) <br />SEPTEMBER(08) 0.18 <br />0 4.58 4.76 30.65 . <br />44,47 . <br />23 <br />~ 14.90 5.49 <br /> <br />OCTOBER(08) .16 <br />0 <br />15 3.56 <br /> <br />2 <br />6 <br />3.72 <br />8.89 <br />20.16 • <br />20.90 13.82 <br />11 <br />27 4.46 <br /> <br />TOTAL . . <br />5 2.80 x,00 4 <br />64 <br />1 . 5.91 <br /> 3.29 32.07 35.36 85.36 . <br />192.58 232. <br />44 <br />62.46 8'~ <br />44.76 7.68 <br /> <br /> <br /> <br />(1) Total lagged post-pumpin de letions at the Stut e pit <br />(2)Total la ed minin depletions which reflect existin conditions at t <br />(3)Total <br />bi he Timanth-Connell Pit inGudin eva orati on from th <br />h <br /> <br />com <br />ned lagged depletions (1)+(2) e rec <br />a a ond ) <br />_ <br />(4)Accretions and depletions to river from 2 Box Elder Ditch shares <br />(5) Farm Head ate delive from 2 Box Elder Ditch shares into the rec <br />(6) La <br />d ha a it Burin the irri ation season <br />e <br />accretions from recharge of the Box Elder shares accruin to the river <br />(7) Summer Return flow obli ation for the 2 shares that will be maintained in their historic attem b the recha e ro ram <br />(8) Winter Retum flow obligation for the 2 shares that will be maintained in their historic attem b the recha e r ram <br />(9) Monthl excess and deficit realized at the aver, (6)-(3 -(7 - 8) <br /> <br /> <br /> <br /> <br /> <br />Connell Resources, Inc. combined monthly distribution and replac~ements(07-08) <br />