Laserfiche WebLink
During operations straw bales were <br /> placed below the RDA conveyor on <br /> both sides of the Purgatoire River. <br /> With the passage of time, these <br /> bales have deteriorated due to <br /> weather. The operator should <br /> replace and re-position bales at <br /> these two locations to be effective. <br /> Also, ditch D13 appears to be filling <br /> due to sediment deposition from <br /> approximately the Purgatoire River <br /> diversion structure down to below <br /> the intersection with culvert C13. <br /> This V-ditch (shown below) should <br /> be re-shaped to design <br /> specifications with a depth of 1.23 feet and a top width of 6.2 feet. <br /> 4 <br />