My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-23_HYDROLOGY - M2001001
>
Day Forward
>
Hydrology
>
Minerals
>
M2001001
>
2007-10-23_HYDROLOGY - M2001001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:11 PM
Creation date
11/30/2007 9:47:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
HYDROLOGY
Doc Date
10/23/2007
Doc Name
Substitute water supply plan
From
Office of the State Engineer
To
Applegate Group, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimberly K. Edwards <br />October 23, 2007 <br />Page 2 <br />consumption, lagged depletions, CU credits generated from dry-up, and monthly <br />requirements for leased replacement water are shown on your attached Table 4, <br />Estimated Replacement Schedule. Due to the timing of the approval of this SWSP <br />request, releases of the leased water for August and September must be made in <br />coordination with the Water Commissioner, and other monthly releases of leased water <br />may be aggregated for release at the discretion of the Water Commissioner. <br />CONDITIONS OF APPROVAL <br />This substitute water supply plan is hereby approved pursuant to CR.S. § 37-90- <br />137(11), subject to the following conditions: <br />This plan is valid through April 30, 2008, unless otherwise revoked or modified. <br />2. This substitute water supply plan may be revoked or mod~ed at any time should it <br />be determined that injury to other water rights has or will occur as a result of this <br />plan. <br />3. A copy of the water lease agreement with Dolores Water Conservancy District <br />must be submitted to the Water Commissioner and this office within 2 weeks of <br />receipt of this letter. <br />4. If this plan will not be made absolute by a water court action by the plan's <br />expiration date, an extension request must be submitted to this office at least 45 <br />days prior to the expiration date of this plan (by March 16, 2008). Thereafter, <br />annual renewals must be submitted to this office with the statutory fee of $257, <br />unless the plan is made absolute in that year by a water court action. <br />5. The exposed surface area may not exceed 4.1 acres and water consumed by <br />operations associated with this mining operation must not exceed those identified <br />on Table 2 unless a prior amendment is approved by this office. <br />6. Approval of this plan is for the purposes as stated herein. Any additional uses <br />for this water must first be approved by this office. <br />7. All pumping for dust control shall be measured in a manner acceptable to the <br />Division Engineer. <br />8. Adequate accounting of depletions and replacements (in acre-feet) must be <br />provided to the Water Commissioner and Division Engineer on forms and at <br />times acceptable to both of them. The accounting form(s) shall be sufficient to <br />demonstrate that the net effective replacement equaled or exceeded the total <br />depletion on a monthly basis. All replacement water must be concurrent with <br />depletions in quantity, timing and location, except that releases may be <br />aggregated at the discretion of the Division Engineer. Said accounting must be <br />received by the 10th of the month following the reporting period. <br />9. The name, mailing address, and phone number of the contact person who will <br />be responsible for operation and accounting of this plan must be provided on the <br />accounting forms to the Division Engineer and Water Commissioner. <br />,`~. <br />4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.