Laserfiche WebLink
1 <br /> <br />' Connell plans to mine to the claystone bedrock. The claystone is generally competent and will <br />withstand erosional forces. However, some aeeas might not contain marketable sand and gravel <br />' down to the bedrock. This areas will remain exposed until the reservoir is filled with water. To help <br />suppress dust, Connell will consider seeding aeeas of the reservoir bottom that have a high potential <br />for dust emission. <br />1 Processing & Asphalt Batch Plant Site/Equpment <br />' The processing equipment, asphalt batch plant, and other equipment are portable and will be <br />removed from the site following the completion of the project. <br />' Grading <br />Grading will be done to provide stabilized shorelines around the reservoir. All backfilling will be <br />done using native overburden, topsoil and claystone. There are no known toxic materials in the <br />proposed backfill material. <br />' All grading will be done to prevent erosion. Final grading will be done immediately after topsoiling <br />has been completed. Backfilling will be completed in phases after mining is completed. <br />All slopes left by the mining operation will be no steeper than 3H: l V from five feet above and ten <br />feet below the water elevation. All other slopes will be no greater than 2H:1 V. <br />' Earthen berms will be place along the north, south, and east edges of the property prior to completing <br />mining in Phase 3. These berms will serve as a visual screen of the property. <br />' Topsoiline <br />The topsoil will stockpiled for the reclamation process. Stockpiles which remain in place longer <br />than one growing season will be seeded with a fast growing cover to minimize erosion. Handling <br />' of topsoil will be minimized by efficient sequencing of the mining. <br />Stripped topsoil will be stockpiled out of the floodway to reduce the risk of inhibiting the flow of <br />' a flood. In addition, the stockpiles will be aligned with the natural flow of the river. In Phase 2 <br />topsoil will be temporarily stockpiled along sections of the phase perimeter and will be used to <br />reclaim once the aquitard is established. In Phases 1 and 3 through 7, Connell will limit the amount <br />of topsoil stockpiled at any one time by continuously using it to cap backfilled areas. <br /> <br />1 <br /> <br />