My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52692
DRMS
>
Back File Migration
>
Report
>
REP52692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:12 AM
Creation date
11/27/2007 1:25:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/7/1996
Doc Name
1995 ARR & AHR EXHIBIT 8 WEST PIT EXCESS SPOIL FILL
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For J. A. Kiger January 12, 1996 <br />During the quarter beginning October 1, 1995 and ending December 31, 1995, <br />I inspected the area in which the West Pit Excess Spoil Pill is being <br />constructed. The purpose of these inspections was to inspect the areas currently <br />being dumped complete by the truck/shovel fleet and final eloped using dozers; <br />inspect the areas being topaoiled, contour furrowed and seeded; inspect the east <br />aide collection ditch construction; inspect the fill for areas of water seepage <br />or surface drainage and to satisfy the requirements of mMG Rule 4.09.1(lla). <br />During the inspections it was observed that the two percent, 25 foot wide <br />catch bench ditch at the 7150 elevation was complete; the surface rock drain down <br />the three-to-one slope was complete from the 7150 elevation ditch to the toe of <br />the fill, and the truck dump had advanced to the point that the 7250 contour was <br />nearly dumped in. During the quarter several other notable events have occurred <br />in the Excess Spoil Pill Area. <br />During the quarter, the rock underdrain that runs beneath the west pit fill <br />was completed. The end of the drain was uncovered by shovels and track <br />excavators and the underdrain was completed from station 20+50 to 27+00. {see <br />photographs 83 through 85) <br />During the quarter, the surface drain that runs along the east side of the <br />west pit fill was completed between the 7050 and the 7150 elevations. (See <br />photograph 86) <br />During the quarter, the fill monitoring survey monuments for the 6950, 7959 <br />and 7150 benches were put in place, all slightly below the terrace ditches on <br />those corresponding benches. (See photograph B7) <br />Final contours were accomplished on moat of the fill below the 7250 <br />elevation, except the very east and west ends of the fill. (See photographs 8B <br />through 92) <br />Attached to this report are my certification that all construction <br />requirements have been met thus far in constructing the West Pit Excess Fill, asd <br />the color photographs as required by the CDMG regulations concerning offsite <br />Excess Spoil Fills. <br />r, <br />h <br />,~~~~ ~, <br />Stephen R. Hinkemeyer <br />Sr. Mining Engineer <br />c.c. central files <br />
The URL can be used to link to this page
Your browser does not support the video tag.