My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-15_PERMIT FILE - M2007044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2007-11-15_PERMIT FILE - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:25 PM
Creation date
11/27/2007 1:19:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
11/15/2007
Doc Name
Preliminary adequacy review
From
DRMS
To
Energy Fuels Resources Corp.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Russ Means 9 November 14, 2047 <br />Whirlwind Yline Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item uantit :Extended Cost <br />Set Rebar Anchors and Fine Site Cleaning <br />Decline Bulkheads (both) <br />1.25 yard Load Haul Dump $35/hr. x 10.5 hrs. x 2 x 1.5 $1102.50 <br />Pack ltat <br />1.25 yard :Load Haul Dump $3S/hr. x 18.5 hrs. x 1.5 $971.25 <br />Build Forms, Set Pipes, Valves, and Rebar, Divert Water <br />All. Whirlwind Bulkheads <br />1.25 yard Load Haul Dump $35/hr. x 85.6 hrs. x 3 x 1.5 <br />Set Up anal Pour Bulkhead <br />Decline Bulkheads (both) <br />1..25 yard Load Haul Dump <br />Forklift <br />Pack Rat <br />1.25 yard Load Haul :Dump <br />Forklift <br />Strip Forms, Move Equipment, and Grout Bulkhead <br />All Whirlwind Bulkheads <br />1.25 yard Laad Haul Dump <br />Miscellaneous Costs <br />Al] Whirlwind Bulkheads <br />Compressor usage <br />Air Bean 25 pump usage <br />Flight 123 HF pump usage <br />GD 83 jackleg <br />Outside loader <br />$35/hr. x 21 hrs. x 2 x I.5 <br />$20/hr. x 21 hrs. x 2 x 1.S <br />$35/hr. x 38 hrs. x 1.5 <br />$20/hr. x 38 hrs. x 1.S <br />$35/hr. x 128.4 hrs. x 3 x 1.5 <br />$3000x3x 1.5 <br />$1200x3x1.5 <br />$1620x3x 1.5 <br />$11.25x3x 1..5 <br />$5000/mo. x 3 x 1. S <br />Subtotal Other Equi.pm.ent, not includ.i.ng overhead and prot~t <br />Overhead anal Profit {i~ 1.3.(37~j~, <br />Subtotal. <br />Add S°fn D1tM administration required by statute <br />Other .Equipment Component of Bulkhead Bond <br />Bond Amount for One Required and Two Contin~ency Bulkheads <br />Labor $170,558.00 <br />Supplies, Equipment, and Engineering $238,050.00 <br />Other Equipment $122,539.00 <br />'1'"oral $.531,247.{){} Direct and Indirect Costs Inclusive <br />~~:'v~i;£f ~~f}f~.i +~ti e)fYvL'lYli:it£u ~-4 ~-E~~; ItYCU~yY}:1Tfti~.t£3 4'SGI:~C~iC`sSL~ C.41t.S.t~CSt". <br />$13,482.00 <br />$2205.00 <br />$1.260.00 <br />$1995.00 <br />$1140.00 <br />$20,223.00 <br />$13,500.00 <br />$5400.00 <br />$7290.00 <br />$5062.50 <br />$27,o44.oa <br />$103,297.50 <br />1.3.500.98 <br />11 f~.798.41s <br />583f),92 <br />$122,5'39.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.