Laserfiche WebLink
Memo to .Russ Means 8 November l 4, 2007 <br />Whirlwind iYiine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Quantity __ Extended Cost <br />Diesel $1500 x 3 $4500.00 <br />. <br />Electricity $5000 x 1.5 $7500.00 <br />Safety supplies $1000 x 1.5 $ i 500.00 <br />Intake screen, bypass pipe $200 x 1.5 $300.00 <br />install Ventilation <br />Terry Tunnel <br />Generator <br />Fan <br />Flatbed truck and loader <br />Contractor install <br />Vent bag <br />Lower Decline Bulkhead <br />Generator <br />Fan <br />Flatbed truck and loader <br />COntractOT install (note: would not mobilize for less) <br />Vent bag <br />Upper Decline Bulkhead <br />Generator <br />Fan <br />Flatbed truck anal loader <br />Caritractor install (nose: would not mobilize for less) <br />Vent bag <br />Pack Rat <br />Generator <br />Fan. <br />Flatbed truck and loader <br />Contractor install (note: would not mobilize for less) <br />Vent bag <br />$800 <br />$3000 <br />$700 <br />$6400 <br />$4755 <br />$800 x t.S <br />$3000 x l..S <br />$700 x i .s <br />$6400 x 1.5 <br />$4755 x 0.65 x t .5 <br />$800 x t.s <br />$3000 x I.5 <br />$700 x I.5 <br />$6400 x t .5 <br />$4755 x 0.59 x 1.5 <br />$so4 x t.s <br />$3000 x ] .5 <br />$700 x l .5 <br />$6400 x I.5 <br />$4755 x 0.62 x 1.S <br />S~.zbtatal Srpplies, Euiprnertt, a~?d Enineering, i~~ctudes overhea€~ and profit <br />add S~f~ .D:1~.M.S ac'ln~ini.stratiori re~ui.red 'r;y statute <br />Supplies, Equipment, and. Engineering C;omparzent of Bu.lkl~:ead Band <br />$1200.00 <br />$4500.00 <br />$ l aso.ao <br />$9600.00 <br />$4636.13 <br />$12oa.oo <br />$4500.40 <br />$ t 050.00 <br />$9600.00 <br />$4208.18 <br />$124a.o4 <br />$4500.00 <br />$1054.00 <br />$9600.00 <br />$4422.1 S <br />$226.71.4.65 <br />1.1.335.73 <br />$238,054.00 <br />Usher Equipment Costs, n~n# inclndin~ C1Ererhead and Prat <br />Task and Cost Item Cruantity _ Extended Cast <br />Initial. Site Cleaning <br />Decline Bulkheads (both) <br />Two yard :Load Haul Dump $45/hr. x 10.5 firs, x 2 x 1.5 $1417.50 <br />lack. Rat <br />"I`~va ~Jard Load E-Iaul. Dutnp $45;1rr.. x 13.5 l7.rs. x l.5 $1248.75 <br />