My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP52259
DRMS
>
Back File Migration
>
Report
>
REP52259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:56:51 AM
Creation date
11/27/2007 1:18:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
2/12/2004
Doc Name
January 2004 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />February 10, 2004 <br />Mr. Jim Dillie / <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 / <br />January 2004 Monthly Report <br />Dear Mr. Dillie: <br />~~~~~y <br />~t~~~~~~ <br />FEB i 2 2004 <br />Givision ofMinerals and Geology <br />The following summazizes monitoring and site activities at the Battle Mountain <br />Resources Ina (BMRI), San Luis Project for the month of January 2004. <br />Surface and ground water monitoring and analysis were completed for all required sites <br />during the month per the terms and conditions of the TR-32 Quality Assurance and <br />Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on January 29`1i, no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezo- <br />meters, the West Pit and the tailing embankment monitoring wells on Januazy 29t1'. The <br />January 29`s tailing impoundment piezometer measurements identified these installations <br />were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables <br />1 and 2 below identify the depth to water measurements collected for each of the site <br />monitoring wells, piezometers and lysimeters as required by the terms and conditions of <br />the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently <br />during the month to minimize the collection pond level. The leak detection system was <br />measured on January 29`s. The January collection pond underdrain flow average was <br />48.99 gpm and a total of 210 gallons of water was excavated from the leak detection <br />system yielding a monthly average of 7.0 gpad. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.