Laserfiche WebLink
<br />Five elution cycles were completed. Dore' production <br />commenced with a 1.560 kilogram pour on April 16th. <br />2.0 Metallurgical <br />2.1 Reagent Consumption <br />Reagent Aril YTD <br />Cyanide 2.84 1.67 <br />Lime 2.59 2.33 <br />Grinding Media <br />SAG 4.54 3.98 <br />Ball 4.10 5.12 <br />Flocculent ---- 0.04 <br />Sulfuric Acid 2.46 3.10 <br />Carbon ---- ---- <br />Sodium Hydroxide 0.52 1.06 <br />Hydrochloric Acid 0.08 0.08 <br />Water Treatment 0.43 0.13 <br />